16 – 20 Princess St

Client : Red 1 Construction

Address: 16 - 20 Princess St, Brighton Le Sands, NSW 2018

Scope of Work

Project Description:
Site survey, prelim report, site fencing, bulk/detail excavactaion, shoring wall, panel for crane base, spoil removal, temp ground anchor and temp bracing, de-watering, and capping beam.
Scope of Work :
  • CSM Retaining Wall – 161Lin.m for 3 Basements
  • CSM Barrettes – 12Lin.m
  • Capping Beam 116Lin.m (650mmx600mm)
  • Temporary Hollow Bar Anchors
  • Temporary Steel Bracing – 6No CHS610 & CHS450
  • Bulk and Detailed Excavation
  • Dewatering
  • Sheet Piles – 24 Lin.m
  • Turn Key
Equipment Used:
Bauer RTG19