Project Description: CF Group installed a 640mm thick CSM shoring wall for a 3 level basement excavation. The CSM panels were installed up to 16m depth and will be supported by anchors and internal bracing.
Scope of Work : CSM Shoring wall, Temporary Anchors, Internal Bracing, Spoil Management.