Cranbrook High School Re-development

Client : Richard Crookes Constructions

Address: 1A Rosebay Av., Rosebay

Scope of Work

Project Description:
  • Turn-Key package project included cased secant wall, capping beam, permanent & temporary anchors, bulk & detail excavation, and foundation piles
  • Excavation of approx. 100,000m3 of material (sand & Sandstone)
  • 650m length of shoring wall supporting up to 16m retained height
  • Cased secant piles up to 16m depth
  • Preparation of platform up to 20m above NGL and adjacent to existing heritage building
  • In House design with 3rd Party review to satisfy client
  • Permanent vertical anchors designed and installed to achieve 100-year lifespan.
Scope of Work :
  • Double Rotary and CFA shoring piles
  • Temporary and Permanent Anchors
  • Capping Beam
  • Remediation
  • Bulk and Detail Excavation
  • Foundation Piles
  • Shotcrete
  • Sheet Piles
Equipment Used:
  • 2No. Liebherr LRB255 piling rigs (Double Rotary and CFA)
  • 2No. Liebherr LB36 piling rigs
  • Liebherr HS845HD Service crane
  • Various Size Excavators ranging from 2.5t to 50tonne
  • Liebherr PR776 Dozer
  • CAT D7 Dozer
  • 28t and 48t Dump Truck
  • Hyundai Loader
  • ABI Piling Rig (Sheet Piling)
  • Tamrock Pantera Anchoring Rig
  • 2No. Liebherr THS110 D5 Concrete Line Pump

Share:

Recent Projects

Send Us A Message