Multi-Storey Apartments
Client: Steve Nolan Constructions
Address: Railway Pd. Burwood
Description
CF Group installed 600mm and 750mm diameter bored soldier piles adjacent to Burwood Railway Station, drilling up to depths of 19m with sockets exceeding 10m into Class II Shale.
Equipment Used
LRB255 Piling Rig

