Dee Why Grand
Client: Southern Cross Constructions
Address: Pittwater Rd. Dee Why
Description
CF Group installed 30m length AZ36 sheet piles (done for the first time in the southern hemisphere) for a 6-level basement excavation. Four rows of temporary ground anchors installed to provide lateral support to the shoring
Equipment Used
LRB255 Piling Rig to install 30m sheet piles, PVE40VM Vibro Hammer, Tamrock Anchoring Rig to install 76mm hollow bar anchors