Cazzie Club



Client:    Link Constructions
Address:    Anzac Pd. Kingsford

Description

CF Group installed an impermeable Soil Mix shoring wall for a 2 level basement with one row of hollow bar anchors.

Equipment Used

TEC attachment on the Leibherr LRB255 Piling Rig