Cazzie Club
Client: Link Constructions
Address: Anzac Pd. Kingsford
Description
CF Group installed an impermeable Soil Mix shoring wall for a 2 level basement with one row of hollow bar anchors.
Equipment Used
TEC attachment on the Leibherr LRB255 Piling Rig

